ElNahda Tunnel

Mourad tunnel was one of the most challenging projects as it is one of the most vital and biggest tunnels in Egypt, with a total length of 1,700m and a width of 7m for each direction and 2 lanes in Mourad Street. 

The tunnel is divided as follow:

• A tunnel with a length of 550m from Giza to El Galaa Bridge

• A tunnel with a length of 850m from El Galaa Bridge to Giza

• An outlet from El Galaa to Cairo University with a length of 300m.

It was one of the most challenging tunnels for El Nassera as there were many intersections in the entrance of tunnels.

This tunnel is luminated according to the CIE Standard for tunnels with high ended Local luminaires “Vito 80W-150W”. Also, El Nassera concerned with lighting the streets leading to the tunnel using its Local Luminaire Ramsis.